Close Menu
  • Početna
  • Ekonomija
  • Finansije
  • Investicije
  • Kompanije
  • Banke
  • Auto
  • Biznis cafe
Facebook X (Twitter) Instagram
Najnovije vijesti
  • Više od 300 direktora i poduzetnika dolazi na konferenciju „Kako ubrzati rast?“
  • Na mjestu hotela Konjuh gradi se veliki kompleks: Evo detalja
  • Prosječna plata u Federaciji BiH za januar 1.671 KM
  • Nikšić i ministri razgovarali s predstavnicima Operator-Terminala i Željeznica FBiH
  • Italijanska firma u Srbiji otpustila 348 ljudi usred smjene
  • Ko želi srpsku vojnu industriju: Vučić otkrio koje fabrike su na meti
  • Članica HIFA Oil Koncerna među najpoželjnijim poslodavcima u BiH: Euro-Metali na listi za 2025.
  • Regionalni div ide u investiciju od 100 miliona eura i širi proizvodnju
  • Metalska industrija regiona okuplja se u Sarajevu 16. aprila
  • Predstavljen program poticaja za mala i srednja preduzeća u ZDK za 2026. godinu
Biznis InfoBiznis Info
Facebook X (Twitter) Instagram YouTube LinkedIn
  • Početna
  • Ekonomija
  • Finansije
  • Investicije
  • Kompanije
  • Banke
  • Auto
  • Biznis cafe
Biznis InfoBiznis Info
Home»News in English»Bosnia's 13.8 mln euro Karaula road tunnel opens for traffic
News in English

Bosnia's 13.8 mln euro Karaula road tunnel opens for traffic

BiznisInfoBy BiznisInfo28/09/2016Updated:29/09/2016Nema komentara1 Min Read
Facebook Twitter LinkedIn Telegram Pinterest Tumblr Reddit WhatsApp Email

The Karaula tunnel, on the main road linking Sarajevo with Tuzla, has been opened for traffic.

The construction of the tunnel, worth BAM 27 million (13.8 million euro), was conducted by Austria’s Strabag with Bosnian firm Entea acting as subcontractor, under a deal signed with state-owned road company JP Ceste FBiH in April 2014.

The Karaula tunnel, which will shorten the length of the road connecting the capital of Sarajevo with Tuzla, in the north of the country, is one of three phases in the construction of a section on the M-18 highway.

So far, two phases have been implemented – the construction of the 902 m long tunnel and two bridges with lengths of 130 m and 150 m, respectively.

The third phase includes the construction of a 1,506 m long road section and another two bridges, 279 and 130 m in length.

Excavation works on the tunnel officially began in June 2014. Completion was envisioned to take place in October 2015.

Podjeli:

  • Share on X (Opens in new window) X
  • Share on Facebook (Opens in new window) Facebook
  • Share on Pinterest (Opens in new window) Pinterest
  • Share on Tumblr (Opens in new window) Tumblr
  • Share on Telegram (Opens in new window) Telegram
  • Share on Reddit (Opens in new window) Reddit
  • Share on LinkedIn (Opens in new window) LinkedIn
  • Share on WhatsApp (Opens in new window) WhatsApp
Tunel Karaula
najnovije

Više od 300 direktora i poduzetnika dolazi na konferenciju „Kako ubrzati rast?“

17/03/2026

Na mjestu hotela Konjuh gradi se veliki kompleks: Evo detalja

17/03/2026

Prosječna plata u Federaciji BiH za januar 1.671 KM

17/03/2026
IZDVOJENO

FMCG Retail Summit: Budućnost maloprodaje u fokusu

16/03/2026

Toyota BH i NS/FS BiH nastavljaju zajednički put ka novim pobjedama

13/03/2026

BHANSA: Pet godina zaredom u plusu unatoč rekordnim izazovima

13/03/2026
Tagovi
NaftazapošljavanjeSASEVolkswagenautomobiliBLSEinvesticijeBingoBankeHrvatskaIzvozVlada FBiHKonzumNjemačkaBoljiposao.comturizam
O Nama

BiznisInfo je najposjećeniji poslovni portal u BiH. Pružamo najbolje i najbrže informacije iz oblasti biznisa i finansija. Donosimo savjete za uspjeh i informacije o investicijama u BiH.

Kontakt

© Sva prava pridržana, Agencija Number One, Sarajevo. WEB Development ElabSarajevo.com

© Sva prava pridržana, Agencija Number One, Sarajevo. WEB Development KGDevs.com

Type above and press Enter to search. Press Esc to cancel.