Close Menu
  • Početna
  • Ekonomija
  • Finansije
  • Investicije
  • Kompanije
  • Banke
  • Auto
  • Biznis cafe
Facebook X (Twitter) Instagram
Najnovije vijesti
  • Energoinvest dobio veliki međunarodni spor ‘težak’ desetine miliona eura
  • Sarajevo domaćin “Balkan Expo 2026” – najvećeg sajma hrane u BiH
  • Novi simbol grada: Potpisan ugovor za impozantnu zgradu u Sarajevu
  • Data saglasnost za otvaranje pregovora o sporazumu s Hrvatskom za Južnu interkonekciju
  • Kanton Sarajevo i Grad Beč o intenziviranju saradnje, u fokusu privreda i inovacije
  • Energoinvest partner za spas Željezare Zenica
  • Za poslovanje bez granica – m:tel Travel BIZ tarife
  • Bh. industrijski div gradi novi pogon: Veliki ulazak u auto-industriju
  • Volkswagen dramatično reže kapacitete: Milion vozila manje
  • Tim Cook odlazi s direktorske pozicije u Appleu, novi šef John Ternus
Biznis InfoBiznis Info
Facebook X (Twitter) Instagram YouTube LinkedIn
  • Početna
  • Ekonomija
  • Finansije
  • Investicije
  • Kompanije
  • Banke
  • Auto
  • Biznis cafe
Biznis InfoBiznis Info
Home»News in English»Bosnia's Stanari TPP developer to officially launch plant on Sept 20
News in English

Bosnia's Stanari TPP developer to officially launch plant on Sept 20

BiznisInfoBy BiznisInfo14/09/2016Nema komentara1 Min Read
Facebook Twitter LinkedIn Telegram Pinterest Tumblr Reddit WhatsApp Email

EFT Rudnik i Termoelektrana Stanari, an EFT Group company, said on Tuesday it will officially launch Bosnia's 300 MW Stanari thermal power plant (TPP) on September 20.

The ceremony will mark the completion of works on the TPP, which began in 2012, the company that developed the project said in a statement.

In May, Stanari TPP obtained a one-year temporary operating license from the environment ministry of the Republika Srpska, following which it began delivering electricity to the Bosnian entity's grid at full capacity.

EFT was awarded a concession contract to develop the Stanari TPP in 2008. The total value of the undertaking is estimated at over 560 million euro ($628.4 million). The main building contractor is China's Dongfang.

The power station will have an annual output of 2,000 GWh with annual coal consumption planned at 2.3 million tonnes, EFT said earlier.

The Stanari coal basin is situated some 70 km east of Banja Luka, in central Bosnia and Herzegovina. EFT has been operating the mine since May 2005.

UK-based EFT Group is an energy trading and investment group, focused on Western, Central and Southeast Europe.

Podjeli:

  • Share on X (Opens in new window) X
  • Share on Facebook (Opens in new window) Facebook
  • Share on Pinterest (Opens in new window) Pinterest
  • Share on Tumblr (Opens in new window) Tumblr
  • Share on Telegram (Opens in new window) Telegram
  • Share on Reddit (Opens in new window) Reddit
  • Share on LinkedIn (Opens in new window) LinkedIn
  • Share on WhatsApp (Opens in new window) WhatsApp
najnovije

Energoinvest dobio veliki međunarodni spor ‘težak’ desetine miliona eura

22/04/2026

Sarajevo domaćin “Balkan Expo 2026” – najvećeg sajma hrane u BiH

22/04/2026

Novi simbol grada: Potpisan ugovor za impozantnu zgradu u Sarajevu

22/04/2026
IZDVOJENO

Za poslovanje bez granica – m:tel Travel BIZ tarife

21/04/2026

Zaradite prije nego što počnete štedjeti: Uzmite 3% kamate unaprijed!

15/04/2026

Reklama za Arix svojevrsna je posveta usponu Fabrike deterdženata Dita

15/04/2026
Tagovi
Boljiposao.comSASEVlada FBiHzapošljavanjeturizamIzvozinvesticijeNaftaNjemačkaautomobiliBankeVolkswagenBLSEbiznis vijestiBingoHrvatska
O Nama

BiznisInfo je najposjećeniji poslovni portal u BiH. Pružamo najbolje i najbrže informacije iz oblasti biznisa i finansija. Donosimo savjete za uspjeh i informacije o investicijama u BiH.

Kontakt

© Sva prava pridržana, Agencija Number One, Sarajevo. WEB Development ElabSarajevo.com

© Sva prava pridržana, Agencija Number One, Sarajevo. WEB Development KGDevs.com

Type above and press Enter to search. Press Esc to cancel.